It's the second day of the construction phase of the park and everyone got a pair of gloves to be able to work safely.
The main task is to level the land by hand. And that means a lot of lifting, and digging under the sun.
Critical points have to be measured and properly labeled.
Above, James and Kyle try to make sure that the area was accurately being leveled.
Tired students still having some fun.
More materials came in, so there was more heavy lifting to be done.
Teamwork and cooperation help get things done.
There's still so much to be done in so little time. Tomorrow promises to be another digging marathon for everyone.
Wednesday, May 13, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment